缩写名/全名 |
J SCHEDULING
JOURNAL OF SCHEDULING |
||||||||||||||||||||||||||||
ISSN号 | 1094-6136 | ||||||||||||||||||||||||||||
研究方向 | 工程技术-工程:制造 | ||||||||||||||||||||||||||||
影响因子 | 2015:1.023, 2016:1.281, 2017:1.153, 2018:1.598, 2019:1.765, | ||||||||||||||||||||||||||||
出版国家 | NETHERLANDS | ||||||||||||||||||||||||||||
出版周期 | Bimonthly | ||||||||||||||||||||||||||||
年文章数 | 44 | ||||||||||||||||||||||||||||
出版年份 | 1999 | ||||||||||||||||||||||||||||
是否OA | No | ||||||||||||||||||||||||||||
审稿周期(仅供参考) | 较慢,6-12周 |
||||||||||||||||||||||||||||
录用比例 | 容易 | ||||||||||||||||||||||||||||
投稿链接 | http://www.editorialmanager.com/josh/ | ||||||||||||||||||||||||||||
投稿官网 | http://www.springer.com/business+%26+management/operations+research/journal/10951 | ||||||||||||||||||||||||||||
h-index | 55 | ||||||||||||||||||||||||||||
CiteScore |
|
||||||||||||||||||||||||||||
PubMed Central (PMC)链接 | http://www.ncbi.nlm.nih.gov/nlmcatalog?term=1094-6136%5BISSN%5D | ||||||||||||||||||||||||||||
中科院SCI期刊分区 ( 2018年新版本) |
|
||||||||||||||||||||||||||||
中科院SCI期刊分区 ( 2020年新版本) |
|
中国学者近期发表的论文 | |
1. | The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs Author: Rubing Chen, Jinjiang Yuan, Yuan Gao Journal: JOURNAL OF SCHEDULING, 2018, Vol., , DOI:10.1007/s10951-018-0598-5 DOI |
2. | A note on reverse scheduling with maximum lateness objective Author: S. S. Li, P. Brucker, C. T. Ng, T. C. E. Cheng, N. V. Shakhlevich, J. J. Yuan Journal: JOURNAL OF SCHEDULING, 2013, Vol.16, 417-422, DOI:10.1007/s10951-013-0314-4 DOI |
3. | Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption Author: Qiulan Zhao, Jinjiang Yuan Journal: JOURNAL OF SCHEDULING, 2013, Vol.16, 253-260, DOI:10.1007/s10951-013-0311-7 DOI |
4. | Stochastic scheduling problems with general position-based learning effects and stochastic breakdowns Author: Yebin Zhang, Xianyi Wu, Xian Zhou Journal: JOURNAL OF SCHEDULING, 2012, Vol.16, 331-336, DOI:10.1007/s10951-012-0306-9 DOI |
5. | Online scheduling with immediate and reliable lead-time quotation Author: Feifeng Zheng, Yinfeng Xu, Weimin Ma, E Zhang Journal: JOURNAL OF SCHEDULING, 2013, Vol.17, 225-236, DOI:10.1007/s10951-013-0363-8 DOI |
6. | A note on the preemptive scheduling to minimize total completion time with release time and deadline constraints Author: Long Wan, Jinjiang Yuan, Zhichao Geng Journal: JOURNAL OF SCHEDULING, 2014, Vol.18, 315-323, DOI:10.1007/s10951-014-0368-y DOI |
7. | Two-machine interval shop scheduling with time lags Author: Xiandong Zhang, Steef van de Velde Journal: JOURNAL OF SCHEDULING, 2013, Vol.18, 359-368, DOI:10.1007/s10951-013-0336-y DOI |
8. | Optimal <Emphasis Type="Italic">K</Emphasis>-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times Author: Xin Li, Richard Y. K. Fung Journal: JOURNAL OF SCHEDULING, 2015, Vol.19, 165-176, DOI:10.1007/s10951-015-0448-7 DOI |
9. | A new approximation algorithm for multi-agent scheduling to minimize makespan on two machines Author: Kejun Zhao, Xiwen Lu, Manzhan Gu Journal: JOURNAL OF SCHEDULING, 2015, Vol.19, 21-31, DOI:10.1007/s10951-015-0460-y DOI |
10. | Unary NP-hardness of minimizing the number of tardy jobs with deadlines Author: Jinjiang Yuan Journal: JOURNAL OF SCHEDULING, 2016, Vol.20, 211-218, DOI:10.1007/s10951-016-0479-8 DOI |